| Project: |
The Sydney Hilton Hotel was totally refurbished in 2004. The existing building was stripped to a bare frame and totally refitted. As part of the renovation an arrival court was created. It features a highly transparent glass wall, free spanning clear of the structure on dowel spliced glass fins. The feature piece is a 90 foot glass canopy set on tension trusses.
|
| Responsibility: |
The staff provided engineering and design development of the 30 meter long suspension truss canopy and glass fin systems with glass-glass splice joints.
|
| Architect: |
Johnson Pilton Walker
|
| Completion: |
2005